"Step-by-Step Guide to Preparing Building and Road Estimates as per UPPWD SOR"
- BHADANIS QUANTITY SURVEYING ONLINE TRAINING INSTITUTE

- Aug 12
- 1 min read
Step-by-Step Guide to Preparing Building and Road Estimates as per UPPWD SOR
For civil engineers and quantity surveyors, preparing an accurate estimate for a government project in Uttar Pradesh is all about following the UPPWD Schedule of Rates (SOR) methodically. Whether it’s a school building or a campus road, the process is systematic—and when done right, it saves you from revisions, audit objections, and payment delays.
Step 1: Gather Site and Project DataBegin with drawings, soil test results, site conditions, and scope of work. This ensures your estimate reflects the actual requirements.
Step 2: Break the Work into ComponentsFor buildings, list foundation, superstructure, finishes, water supply, sanitary, and electrical works. For roads, include earthwork, sub-base, base, surfacing, and drainage.
Step 3: Select Correct SOR ItemsRefer to UPPWD SOR to identify exact item codes for each activity. Check the unit, description, inclusions, and lead/lift provisions to avoid mismatches.
Step 4: Calculate QuantitiesFollow IS 1200 measurement rules—centerline method for buildings, cross-section method for roads—ensuring deductions and wastage norms are applied correctly.
Step 5: Apply Rates and Prepare AbstractMultiply quantities with SOR rates to get the cost of each item. Include contingencies, work-charged establishment, and applicable taxes.